FQP Consulting
  • Home
  • Services
    • Project Management
  • Vita
  • Contact
  • Imprint
  • Privacy
  • Menu Menu
  • Vita

Hans-Gerhard Fischbeck

Qualifications

  • Project Management
  • Project Manager TÜV SÜD
  • Quality Management Auditor QMA-TÜV
  • Quality Management Manager QMM-TÜV
  • Efficient Quality Management Techniques
  • Technical Business Administrator (IHK = German Chamber of Industry & Commerce)
  • Certified Mechanical Engineer (DAG Bildungswerk = DAG Educational Work)
  • Apprenticeship with Linde Engineering as technical draftsman in mechanical engineering

Freelance Specialist since January 2018

Auditor, Supplier Management, Risk Management, Application of EN ISO 9004, Audit in accordance with DIN ISO 9001:2015 and EN ISO 19011:2011

Consulting Services for Quality Management and Project Management for chemical process plants.

28 years

expierences with cryogenic – gas plants

14 years

Project and Engineering Management for small and large scale air separation units (ASU’s)

  • ASU Marlin

    Project Manager for two redundant air separation units GAN 2200 in accordance with client specifications (Petronas) including back-up system to be connected to the existing MLNG Plant Marlin in Malaysia. Responsible for the compliance and implementation of the project contract, the adherence to cost and time limits as well as securing the technical realisation of the Linde branded products.

  • ASU Mirfa

    Project Discipline Manager for the engineering and construction of a 48“ pipeline through the desert in Qatar, in the United Arabian Emirates with a length of 43 kilometres a design pressure of 70 bar leading from Mirfa to Habshan for the project Mirfa consisting of 2 large scale air separation units for the client (Elixir)

  • ASU Pearl

    Engineering and Interface Manager for eight identical air separation units in Pearl (Qatar). Responsible for the engineering and manufacturing of LOX and LIN modules as well as a vacuum insulated pipeline of 2 kilometres. Securing the technical realisation in accordance with Shell standards.

    Project Coordinator for the technical contract management as well as for the compliance and implementation of HAZOP including the risk management findings of the various disciplines.

    Co-Auditor during project supplier audit

  • ASU Hammerfest

    Project and Engineering Manager for two redundant air separation units GAN 6000 including back-up system for the inertisation of the associated LNG plant, and MEG recovery system in Hammerfest/Norway. Responsibility for compliance with the contractually agreed complex Statoil onshore specifications.

    Securing the adherence to deadlines and realisation of the Linde branded products.

4 years

Construction Management

  • ASU Mirfa

    Construction site coordination for the erection of a 48“ gas pipeline through the desert in Qatar, in the United Arabian Emirates with a length of 43 kilometres a design pressure of 70 bar leading from Mirfa to Habshan for the project Mirfa consisting of 2 large scale air separation units for the client (Elixir). Responsible for the management and coordination as well as the monitoring of subcontractor’s adherence to HSE regulations which were part of the contractual agreement.

  • ASU Hammerfest

    Construction Site Management for two redundant air separation units GAN 6000 including back-up system. Responsible for construction site coordination with the associated LNG total plant facilities. Support for the engineering site management in monitoring the systems required for mechanical completion of the total LNG plant in Hammerfest.

2 years

Strategic Logistics Manager

Strategic Logistics Manager for the calculation of project logistics cost, engineering hours as well as feasibility studies, risk analyses for small to large scale process plants.
Responsible for the logistics service management worldwide starting from new through to potential and approved logistics service companies. Identification of the necessity of an audit in accordance with DIN EN ISO 9001:2008.
Clarify and implement audit including qualification in accordance with DIN EN ISO 14001, BS OHSAS 18001as well as Linde requirements. Submit final recommendation for approval or denial

  • Gas Unit Amur

    Responsible Logistics Quotation Manager for the gas project Amur, Siberia which will be erected during the years 2017 through to 2025 in five phases.

    Determination and recording of the total cost of logistics, contract negotiations with the client in cooperation with the logistics expert team. Auditing of potential Russian logistics companies.

2 years

Engineering Quality Management

Review and new development of audit questionnaires for the approval of logistics service companies within the fields of the following: general logistics service companies, heavy duty and special transports, packing companies.

Worldwide execution of logistics service provider audits: readmission, check of approved logistic service provider.

  • Ethylene Plant Tobolsk

    Deputy Lead Inspector assuring the quality oft he Tobolsk project, a mega ethylene plant in Siberia, Russia

    Responsible for the worldwide organisation of inspectors specialising in inspections of individual items being fabricated in various supplier locations. Compilation of the total inspector documentation. Authority to instruct inspectors and evaluation of the inspection reports. Initiate discussions with the responsible discipline managers, the project management, purchasing and expediting and initiate activities, if required. Determination of quarterly KPI figures including forwarding to the department managers and general managers

The above mentioned summary includes but is not limited to the professional experience of Hans Gerhard Fischbeck.

Credentials

 

Ing. Büro Jürgen Mayrhofer

Search

Contact

Hans-Gerhard Fischbeck

info@fqp-consulting.com

+49 (0) 151 17521851

  • Privacy
  • Imprint
  • Contact
Scroll to top
This website uses cookies to improve your experience. For more information click on Cookie Settings or check out our Privacy Policy.

Accept Reject Cookie settings

Imprint | Privacy policy
Datenschutz & Cookies

Privacy overview

This website uses cookies to improve your experience while you navigate through the website. Out of these cookies, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website.

We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies.
Optional cookies
This category includes various cookies so we are able to improve this website for you and other visitors. These cookies might store personal information.
CookieTypeDurationDescription
PHPSESSID0This cookie is native to PHP applications. The cookie is used to store and identify a users' unique session ID for the purpose of managing user sessions on the website. The cookie is a session cookie and is deleted when all the browser windows are closed.
Necessary cookies
Necessary cookies are absolutely essential for the website to function properly. This category only includes cookies that ensures basic functionalities and security features of the website. These cookies do not store any personal information.
CookieTypeDurationDescription
cookielawinfo-checkbox-necessary0365 daysThis cookie is set by the GDPR Cookie Consent plugin and is used to store the user settings for necessary cookies. It does not store any personal data.
cookielawinfo-checkbox-non-necessary0365 daysThis cookie is set by the GDPR Cookie Consent plugin and is used to store the user settings for optional cookies. It does not store any personal data.
viewed_cookie_policy0365 daysThis cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not a user has consented to the use of cookies. It does not store any personal data.
Save & Accept